Installation Guidelines Pure SPC, SPCMax, DesignerPro
DOCUMENT APPLIES TO: PURE SPC, SPC MAX, DESIGNER PRO
PRODUCT TYPE: RIGID CORE SPC (STONE POLYMER COMPOSITE)
INSTALLATION METHOD: FLOATING (CLICK LOCK)
UNDERLAYMENT: PRE-ATTACHED (NO ADDITIONAL PAD ALLOWED)
1. Jobsite Conditions & Acclimation
- Installation area must be enclosed, dry, and climate-controlled
- Maintain temperature between 60-80 degrees Fahrenheit and RH between 35-75% before, during, and after installation.
- Acclimation is not required unless product was stored in temperatures outside 50-100 degrees Fahrenheit within 12 hours of installation.
- HVAC must be operational at least 48 hours before installation.
Product Inspection & Defect Tolerance
- All flooring must be thoroughly inspected prior to installation for visual defects, dimensional inconsistencies, color variation, and surface irregularities.
- Installation of any material constitutes full acceptance of its appearance and quality.
- Republic allows for a maximum defect tolerance of 5% of the total flooring material, per industry standards.
- Claims for visual or manufacturing defects made after installation will not be accepted.
2. Subfloor Requirements
A. Flatness Tolerance
- Subfloors must be flat within 3/16" over 10 ft or 1/28" over 6ft
- High Spots must be ground down; low spots filled with Portland-based leveling compound.
B. Acceptable Substrates
- APA - grade plywood, OSB
- Concrete (on, above, or below grade)
- Existing tile, vinyl, or resilient flooring (only if fully adhered and grout lines filled)
- Radiant-heated slabs (surface temp less than or equal 85 degrees Fahrenheit)
C. Moisture Testing (Concrete Only)
- ASTM F2170 RH: ≤ 85%
- ASTM F1869 MVER: ≤ 3lbs / 1000 sqft/ 24 hours
- pH range: 7.0 to 9.0
- Mandatory: Install 6 mil poly vapor barrier under all installations over concrete
D. Crawlspaces (Raised Foundation)
- Soil must be 100 % covered with 6 mil black polyethylene.
- Minimum 18" from soil to joists; vent area = ≥ 1.5% of crawlspace square footage.
E. Wood Substrates
- Must be dry, secure, and properly fastened (nail/screw every 6")
- Moisture content should not exceed 12%
- Do not install directly over wood on concrete or below grade
3. Underlayment Policy
- Republic Floor SPC Products include a pre-attached pad.
- Additional underlayment is NOT permitted, except a 6 mil moisture barrier.
- Over-padding can cause excessive deflection and damage locking system.
4. Layout & Expansion
- Leave a 1/4" expansion gap at all vertical obstruction (walls, pipes, cabinetry)
- For spans over 40 ft in any direction, use T-Moldings
- 3/8" expansion required every 20 ft as best practice.
- Do not restrict movement with baseboards or moldings fastened to flooring.
5. Installation Procedure
- Start left to right, tongue edge facing the wall
- Stagger end joints at least 6" (preferably 8")
- Use Spacers to maintain expansion gap
- Use tapping block and rubber mallet to close seams
- Do not force planks
- Final row must be ≥ 2" wide. Use pull bar to engage final pieces.
Illustrated Steps:
Steps 1-4:
- Begin installation working left to right. Insert spacers at edges
- Lock short ends by angling and dropping into place.
- Start second row using an offcut at least 8" long
- Lock long edge by angling, sliding, and dropping in.
Steps 5-6
5. Tap long edge with tapping block to secure fi t. Avoid gapping.
6. Use a bridge piece to close end gaps.
Steps 7-9 and Door Jamb Install
7. Tap end joints with tapping block; continue to final row.
8. Use pull bar to close ends of last row.
9. Lock long edges on final row using pull bar.
Door Jambs: Undercut casing. Tap long and short ends to lock in place beneath trim.



6. Cabinets & Fixed Fixtures
- Do not install flooring under fixed islands or cabinets
- Floor must be allowed to float freely
- Install up to fixed object with appropriate expansion gap and cover with trim
7. Radiant Heat Guidelines
- Approved over hydronic or embedded radiant systems only.
- Surface temp must not exceed 85°F
- Turn system on 2 weeks prior and off 24 hours before/after install
- Gradually increase temp post-installation
8. Maintenance & Post-Install
- Floor can be walked on immediately after install
- Use pH-neutral vinyl floor cleaner only
- Use felt pads under furniture; protect from sun with blinds or UV films
- Place walk-off mats at entries (no rubber-backed mats)
9. Warranty Limitations
Voided if:
- Installed over carpet, cushioned vinyl, or soft subfloor.
- Improper expansion spacing or installation under fixed cabinets.
- Moisture barrier not used over concrete.
- Additional padding used.
- All planks must be inspected before install
- Installation constitutes acceptance
- Moisture test documentation must be retained
10. Disclaimers
- "Waterproof" refers to top-down on protection only
- Product is not moisture vapor barrier
- Manufacturer is not liable for site-related issues including:
- Hydrostatic pressure
- Inadequate crawlspace protection
- UV fading due to lack of window coverings
- Follow all manufacturer guidelines for full warranty coverage